In 1932, in Cambridge, John Cockcroft and Ernest Walton fired protons from a machine they had built into a lithium target and split its nucleus. It was the first nuclear reaction made with artificially accelerated particles. Ninety-four years later, a proton striking lithium is again where our work begins.

The linear accelerator is a few years older. In 1928, at Aachen, Rolf Widerøe built the first working one and showed that a particle can be accelerated in steps along a straight line, without ever needing the full voltage at once. After the war, surplus radar hardware turned the idea into machines: Luis Alvarez's proton linac at Berkeley in 1947, and the first electron linacs at about the same time. In 1953 a linear accelerator began treating patients at Hammersmith Hospital in London, and the hospital linac is now found in thousands of cancer centres. At the end of the 1960s Kapchinsky and Teplyakov proposed the radio-frequency quadrupole, which made compact, high-current proton and ion linacs practical and is the first stage of most of them today.

India has been part of this story almost from the start. Around 1940 Meghnad Saha set out to build a cyclotron in Calcutta. The war intervened, and it gave its first beam only in 1953, the year those first patients were treated in London. The Variable Energy Cyclotron in Kolkata, designed and built in India, gave its first beam in 1977. The Pelletron accelerators in Mumbai and New Delhi were each extended with a superconducting linear booster developed largely in India. SAMEER's first hospital linac went into service in Chandigarh in 1991. Indore has the Indus synchrotrons. At Trombay the LEHIPA proton linac (an ion source, a radio-frequency quadrupole and drift-tube linacs) has taken protons through all its stages to full energy, as the front end of a far larger machine planned for accelerator-driven systems. And India builds for the world's machines too, among them a diagnostic beam for ITER.

What strikes me in this history is how little of the time went into the idea. Again and again the machine was understood on paper long before it did what the paper said. The years went into commissioning: showing by calculation and by measurement that the source, the beam, the shielding and the application behave as designed. It is still so. By the vendors' own announcements, the accelerator-based BNCT system in Helsinki needed about six years from installation to its first trial patients, and the one in Xiamen nearly four to its Phase I trial.

I started this work because I think that time can be shortened if the whole chain is held in one model. We are building a connected model that runs from the nuclear data, through the neutron source and the transport of neutrons and photons, to the application at the far end. In the language of physical AI it is a world model of a neutron source: fast learned emulators of each link, trained on simulations we can trace to their data, checked against measurement, and updated when the real facility differs from the design. A commissioning team could then ask "what if" in seconds and spend its measurement time where the model is least certain. We are starting with proton–lithium sources for boron neutron capture therapy.

The chain, held in one model

measurement updates the model

Reference libraries, traced back to the measurements behind them.

A proton beam strikes a lithium target and makes the neutrons.

How neutrons and photons move through the source, the shielding and the room. We cross-check it in four independent codes.

The treatment room, the inspection station or the experiment at the far end.

What the instruments report. Where the model and the measurement differ, the model is to be corrected.

Fast learned stand-ins for each link, so that a question which takes hours of calculation can be asked in seconds.

Concept diagram of the connected model we are building. It is not a finished system.

The same chain serves the other sources we are designing. Alongside BNCT, these are compact, switchable neutron sources for Indian production lines: to image the hydrogen-rich ordnance and seals inside the metal pyrotechnic casings of space hardware, alongside X-ray inspection; to measure the elemental composition of the raw mix on cement and mineral conveyor belts, with a source that turns off when it is not in use; to test memory and logic chips for the upsets that neutrons cause; and to show where the lithium and the electrolyte sit inside a sealed battery cell without opening it. Each is a source, a shield and a measurement that has to be commissioned, and each can draw on the same model.

The other sources we are designing

Image the hydrogen-rich ordnance and seals inside the metal pyrotechnic casings of space hardware, alongside X-ray inspection.

Measure the elemental composition of the raw mix on conveyor belts, with a source that turns off when it is not in use.

Test memory and logic chips for the upsets that neutrons cause.

Show where the lithium and the electrolyte sit inside a sealed cell without opening it.

Compact, switchable neutron sources for Indian production lines. Concepts; none is built.

Fusion is where this is meant to go. In deuterium–tritium fusion the neutrons carry four-fifths of the energy, so much of the engineering is knowing where they go. The connected model is the shared foundation of every step on our path: after the accelerator source comes a linear magnetic mirror, whose plasma is itself a steady neutron source. The source changes; the chain behind it does not.

Our path, one neutron source at a time

Shared foundation across all four steps: nuclear data traced to measurement, the connected model, and an Indian supply chain.

A proton beam strikes a lithium target to produce neutrons, for hospital BNCT and compact industrial analysis.

A linear magnetic mirror confines plasma as a steady volumetric neutron source. It starts with a planned hydrogen experiment.

Fusion neutrons drive reactions in a surrounding subcritical blanket.

Work towards low-carbon electricity using fusion fuel cycles that reduce neutron activation.

From our company profile. Steps 2 to 4 are research directions.

What we are releasing now is an early step, and a deliberately small one. Before we trust a learned emulator of our own physics, I wanted to know whether an automated research loop can be made to work under rules that anyone can check: a public benchmark, a comparison against tuned models, a test scored once, every attempt recorded. On NVIDIA's public Linear Radiation Transport dataset the loop improved a model under those rules, and the release says plainly where the rules fell short.

The first step, in one chart

The same numbers as a table
ModelValidationPublic test
Final loop model (ledger row 197)0.002320.00224
Gaussian process, tuned0.003430.00308
Ridge on polynomial features, tuned0.01700.0177
Quantile boosted trees, tuned0.02350.0259
Quantile boosted trees, untuned0.04910.0542
Gaussian process, untuned0.1850.205
Ridge, untuned0.2040.211
Nearest neighbours, untuned0.2150.220
Nearest neighbours, tuned0.2180.229
Training median (the constant starting program)0.4520.457
Error of each model on NVIDIA's public Linear Radiation Transport dataset: the mean over three seeds of the 90th-percentile absolute log error. Lower is better; the scale is logarithmic. The result is in-distribution only: two families in one public dataset, and validation guided the selection. The full table and the limits are in the technical note.

Shortening commissioning is the thesis we are testing. The early signs are encouraging. Our internal work is now taking the same method to our own calculations, and we will be releasing more of this research soon.

Concept image: the proposed BNCT Reference Centre seen from above, with its rooms open to view Interactive concept model

Walk through the proposed BNCT Reference Centre

Follow a patient’s day from arrival to aftercare, room by room: consultation, boron infusion, positioning, the treatment room with the control room beside it, and the accelerator behind the wall. Every room and the main equipment are labelled in plain words.

Explore the proposed centre

Concept visual. The facility is not built.

Concept visual. The facility is not built.

Read the work

Code: https://huggingface.co/asplfusion/ar1-d0-guarded-autoresearch
Full record: https://huggingface.co/datasets/asplfusion/ar1-d0-audit-trail
Technical note: https://doi.org/10.5281/zenodo.24557382

Abhinav Jha
Co-founder & Director, ASPL Fusion

Sources

  1. Cockcroft, J. and Walton, E. Disintegration of Lithium by Swift Protons. Nature 129, 649 (1932), https://www.nature.com/articles/129649a0
  2. Widerøe, 1928, Aachen, first working linac; Ising's principle: https://en.wikipedia.org/wiki/Linear_particle_accelerator
  3. Alvarez proton linac, Berkeley, 1947, surplus radar components: https://en.wikipedia.org/wiki/Linear_particle_accelerator; https://www.osti.gov/biblio/475578
  4. First patients on a hospital linac, Hammersmith, 1953: https://museum.aapm.org/exhibit/12-external-beam-radiotherapy; https://www.bir.org.uk/useful-information/history-of-radiology/1950s/1950s-radiotherapy/
  5. Radio-frequency quadrupole, Kapchinsky and Teplyakov (patent application 1968, publications 1969, usually dated 1970): https://en.wikipedia.org/wiki/Linear_particle_accelerator; https://arxiv.org/pdf/2212.04249
  6. Saha's Calcutta cyclotron begun about 1940, internal beam 1953: https://repository.ias.ac.in/28470; https://data.dae.gov.in/Nuclear_Energy/saga/vol2/pdf2/Chapter%20-%2006.pdf
  7. Variable Energy Cyclotron, Kolkata, operational 16 June 1977: https://repository.ias.ac.in/28470; https://data.dae.gov.in/Nuclear_Energy/saga/vol2/pdf2/Chapter%20-%2006.pdf
  8. Pelletrons at TIFR (1988) and IUAC (1991) with superconducting linac boosters, largely Indian-built: https://accelconf.web.cern.ch/SRF2015/papers/tuaa04.pdf; https://www-nds.iaea.org/publications/indc/indc-ind-0050.pdf
  9. SAMEER's first medical linac, Jeevan Jyoti-I, PGIMER Chandigarh, 1991: https://cerncourier.com/a/india-sets-its-sights-on-linac-innovation/
  10. Indus synchrotrons, Indore: https://accelconf.web.cern.ch/PAC2009/talks/th1gri04_talk.pdf
  11. LEHIPA: ion source, radio-frequency quadrupole, drift-tube linacs; full design energy reached; front end for the accelerator-driven systems programme: https://barc.gov.in/barc_nl/2024/2024070804.pdf
  12. ITER's diagnostic neutral beam is India's in-kind contribution: https://www.iter.org/node/17857